Username :
Password :
Latest Tracker Updates
30 June 2015: Alderley Systems secures maintenance contract in Kazakhstan

30 June 2015

Alderley Systems Ltd have been awarded the renewal of a maintenance contract for servicing of metering and control systems placed at Unit 2, Unit 3, Karachaganak Processing Complex (KPC) facilities and the Bolshoi Chagan pumping station . 

The maintenance contract includes guaranteed call out times, telephone support, periodic system health checks and onshore software backups.

The onshore fields located in the north-west region of Kazakhstan are operated by Karachaganak Petroleum Operating B.V. (KPO): a joint venture between BG Group (29.25%), Eni (29.25%), Chevron (18%), Lukoil (13.5%) and KazMunaiGas (10%).

Alderley Systems

29 June 2015: Expro lands oil service contract from Tullow Oil


Sarwarzad Energy Ltd - experts at tracking projects.

Contact us for below services:

[Research] [Advisory] [Consultancy] [Training]