Username :
Password :
Latest Tracker Updates
20 May 2015: Anadarko selects contractors for Mozambique LNG Plant

20 May 2015

Anadarko Petroleum Corporation on behalf of the co-venturers in Mozambique's Offshore Area 1, and after a competitive FEED (front-end engineering and design) process, today announced the selection of a consortium consisting of CB&I, Chiyoda Corporation and Saipem (CCS JV) for the initial development of the onshore LNG plant in Mozambique.

The scope of the work for the onshore LNG plant includes two LNG trains, each with capacity of 6 million metric tonnes per annum (mmtpa), which is an increase of 1 mmtpaper train over the original plan, while maintaining an estimated cost that is consistent with the co-ventures' original projections.

The scope also includes two LNG storage tanks, each with capacity of 180,000 cubic metres, condensate storage, multi-berth marine jetty and associated utilities and infrastructure. The selection of CCS JV is subject to negotiation and entry into a definitive agreement prior to taking FID.

Anadarko operates the Offshore Area 1 with a 26.5-percent working interest. Co-venturers include Empresa Nacional de Hidrocarbonetos E.P. (ENH) (15 percent), Mitsui E&P Mozambique Area1 Ltd. (20 percent), ONGC Videsh Ltd. (16 percent), Bharat PetroResources Ltd. (10 percent), PTT Exploration & Production Plc (8.5 percent), and Oil India Ltd. (4 percent).


Chiyoda Corporation


19 May 2015: NextDecade and CB&I sign FEED and EPC terms for Rio Grande LNG Project


Sarwarzad Energy Ltd - experts at tracking projects.

Contact us for below services:

[Research] [Advisory] [Consultancy] [Training]