Username :
Password :
Latest Tracker Updates
1 March 2016: Cape plc awarded contract on Prelude FLNG Project

1 March 2016

Cape plc has secured a contract with Samsung Heavy Industries (SHI) in South Korea for the installation of insulation to the Cryogenic Pipework on the Process Topside on Shell’s Prelude Floating Liquefied Natural Gas (FLNG) facility.

The Prelude FLNG facility is a global project with the key location for fabrication being in Geoje, South Korea. SHI’s shipyard is where the substructure and topsides are currently under construction and is one of the few dry docks in the world large enough to undertake the fabrication.

Once complete, the Prelude FLNG facility will be moored 475 kilometres north-east of Broome in Western Australia. The Prelude FLNG facility is 488m long, 74m wide and along with its contents, will weigh around 600,000 tonnes. It will be the largest floating offshore facility in the world.