Username :
Password :
Latest Tracker Updates
27 October 2015: Technip to supply the first flexible pipes for Libra Pre-salt Field in Brazil

27 October 2015

Technip has been awarded a contract from Libra Oil & Gas BV, a consortium led by Petrobras Netherland BV (40%) and partners: Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%).

The project includes the supply of flexible pipes for the Libra Extended Well Test field, located in the Santos Basin pre-salt area, Brazil. This is one of the first steps of the Libra giant field development.

This contract covers the supply of high-end flexible pipes including: 8" oil production, 6" service and 6" gas injection flexible pipes. Designed to produce the first Libra field oil, they are the first 8’’ oil production pipes to be installed in pre-salt area.

Technip’s operating centre in Rio de Janeiro, Brazil, will perform the project management and engineering. The highly technological flexible pipes will be produced at Technip's manufacturing sites in Vitόria and Açu, Brazil. Delivery is scheduled to start in the second half of 2016.


26 October 2015: Air Products to build Steam Methane Reformer Plant in Baytown, Texas


Sarwarzad Energy Ltd - experts at tracking projects.

Contact us for below services:

[Research] [Advisory] [Consultancy] [Training]